SHIPPING OF ELECTRIC PART OF REGULATING AND PROTECTING SYSTEM FOR BARNAULSKAYA TPP-
  • Карта проектов. Выполнено по всему миру 1000 проектов

  

Reference list

SHIPPING OF ELECTRIC PART OF REGULATING AND PROTECTING SYSTEM FOR BARNAULSKAYA TPP-

13.06.2012

Rakurs Group specialists have shipped electric part of regulating and protecting system for Т-60/65-130-2М turbine of Barnaulskaya TPP-2.

The scope of works under the contract includes designing, completing, manufacturing, supply as well as adjustment.

Main functions of electric part ofregulating and protecting system for steam turbine include the following:

· keeping of main regulated turbine parameters in modes of electric and heat load;

· measuring of main turbine parameters;

· analysis of turbine condition;

· forming of control actions for regulating and protection.

Electric part ofregulating and protecting system is a serial innovative product of Rakurs-engineering being a part of Rakurs Group and acting on the territory of Neudorf Special Economic Zone. This product has resulted in consolidation with Rakurs old partner – Ural Turbine Works CJSC.

Having been in cooperation since 2006 Ural Turbine Plant and SPC Rakurs in 2011 signed an official cooperation Agreement.

The key purpose of the agreement is cooperation between the companies for joint promotion of products, works and services at the markets of Russia, CIS countries and abroad. The parties have agreed to develop and improve electric part ofregulating and protecting system for steam turbiBy these days the following objects have been successfully equipped with electric part ofregulating and protecting system: Minskaya TPP, Vasileostrovskaya TPP-7, Vyborgskaya TPP-17 (branch Nevskiy of TGK-1 OJSC), Tobolskaya TPP (TGK-10 branch), Krasnodarskaya TPP (TGK-8 branch), Ulan-Udenskaya TPP (TGK-14 branch) and others.ne installed by Rakurs at Ural Turbine Plant turbines.